ENVS 350 Second Homework Assignment

Please use the Homework Submission Form to upload your assignment.

This assigment is due by 8 pm, Monday Feb 8

Use this tool to help with determining exponential growth rates (will be demonstrated in class for the case of Iowa )

Also, Cellphone Example

  1. Can wind replace coal? Currently the US has approximately 336,000 MW of nameplate capacity for Coal fired electricity.

    Let's assume that we have an energy plan to replace this nameplate capacity in coal with wind energy by continuing the build out in wind energy in Iowa, Kansas, Minnesota, North and South Dakota and Texas.

    Use this spreadsheet as your basic reference point

    a) What is the total nameplate capacity in MW for each state as of 2009?

    b) Calculate the approximate growth rate (we will be doing this in class) of wind energy build out in each of the states over the time period of 2000 to 2009.

    c) What is the growth rate for the combined 6 state region over this same period?

    d) Given the growth rate that you determined in c) above, how long will it take for this growth to reach 336,000 MW?

    e) Over this region, in reality, the wind capacity factor is, at best, 50% where as the capacity factor for coal is essentially 100%. This means nameplate capacity has to be twice that of coal. How long will it therefore take to have a nameplate capacity of 670,000 MW?

    f) Comment on the feasibility of obtaining this goal of replacing coal fired electricity with this 6 state wind farm project at 50% capacity factor. What barriers might exist to prevent achieving this goal?



  2. All About Canada:

    Part A: Canada's hydropower:

    Part B: Canada's Oil Sands: