The IvanPah project - 375--400 Megawatts
Some project details:
- Total project cost about 2.2 Billion: $5.5 per watt
- Project footprint: 3500 acres = 14.2 km2: 28 MW per km
- Construction jobs: 2650 = 6.6 Jobs per MW
- Permanent jobs: 65 = 0.16 per MW
Besides the "scorched birds" issue, there are these other objections:
Marketing
Performance in the Real World
- 25% of predicted rate (this makes it really expensive now)
- 60% increase in use of Natural Gas in auxillary boilers to increase electricty production from Steam.
- Physics optics problems not looked into yet
- No energy storage because of no molten salts. Molten salts are coming to this project
|